The Future of Canadian Lithium

About

E3 Lithium is a Canadian lithium brine developer targeting over 32,000 tonnes lithium hydroxide production in 2027 with 1.29 Mt LHM proven and probable reserve and a $3.72B NPVfrom the Clearwater Pre-Feasibility Study.  

Operating in Alberta provides significant jurisdictional advantages such as an available workforce, transparent regulator system and operational excellence from the petroleum industry.

Our Strategy

To build a portfolio of robust lithium production strategically located, minimizing our impact to the environment to support the electrical revolution.

Focus
To establish a reliable and sustainable cashflow through the development of the Clearwater Project

Growth
Significant untapped resources for future expansion

Battery
Battery quality lithium hydroxide produced would enable direct use in cathode production without additional refining.

Partnership
Believe in strong strategic partnerships to support project development

Stock Price

TSX-V
FSE
OTCQX

ETL

1.48 (0.25)

Open: 1.21
Day high: 1.5
Volume: 267,452
Day Low: 1.18

OW3

1.812000 (0)

Open: 1.812000
Day high: 1.812000
Volume: 400
Day Low: 1.812000

EEMMF

1.0645 (0.1684)

Open: 0.8899
Day high: 1.0645
Volume: 65,813
Day Low: 0.8563
15 minute delay

The Clearwater Project

The Clearwater Project, located between Red Deer and Calgary in Alberta, is Canada’s first lithium-in-brine hosted proven reserve with 1.29 million tonnes of LHM [1.13 Mt lithium carbonate equivalent (LCE)], within the Bashaw District.

Project Overview

Sustainable Future

E3 Lithium is committed to environmental sustainability and is developing processes that aim to make the Clearwater Project as sustainable as possible, ensuring the plant operates with minimal environmental impact.

Sustainability Overview

Our Operations

Batteries for electric vehicles are the fastest growing market for lithium products and therefore are E3’s primary downstream market.

Operations Overview

Pre-Feasibility Highlights:

Economic
$3.72B
NPV8 24% IRR
Reserve
1.29 mt
LHM P&P
Operation Life
50
Years
Sustainability

Process water sourced from recycled and waste brine stream

Relatively small land footprint

Estimated 1.9 tonnes CO2 per tonne LHM1

1The mineral resources, mineral reserves, economic details and other technical information contained within this page are part of E3 Lithium’s Clearwater Pre-Feasibility Study, outlined within the June 26, 2024 news release titled “E3 Lithium Outlines Clearwater Project Pre-Feasibility Study and Confirms Brine Reserves and is available on the E3 Lithium’s website (e3lithium.ca/newsroom/news-release) and SEDAR+ (www.sedarplus.ca).

Partners

Pure lithium IOL University of Alberta GreenCentre Canada

Terms and Conditions

By completing the contact information above and clicking the “Sign Up” button, you are expressly consenting to the receipt of electronic messages from E3 Lithium Corp. (the “Company”). If you would like to contact the Company please click on the “Contact Us” link above for the Company’s address and telephone number. You may withdraw your consent to the receipt of electronic messages from the Company at any time by contacting the Company or clicking on the unsubscribe link at the bottom of any electronic message that the Company may send you.